Compare AC EV charger quotes only after each supplier has priced the same configuration, quantity, included features, documentation, and delivery terms. Start with one request for quotation (RFQ) for all bidders. Give each variant its own line, require an exact order code, and ask suppliers to price every required item they exclude from the base offer. Hold the comparison whenever a mandatory item or its price is still unconfirmed.
Issue the Same RFQ to Every Supplier
Use one row per destination market and charger configuration. For example, a portable charger with two possible mains plugs needs two rows if you plan to stock both. Mark requirements as mandatory or preferred. Ask suppliers to quote the requested configuration first and put any proposed substitute on a separate row with its price, lead time, and differences.
Copy this brief into your email or sourcing sheet and repeat the configuration block for each variant.
RFQ reference / revision:
Company / purchasing contact:
Quote response deadline:
Buyer SKU / destination country / intended use:
Product form (portable or wall-mounted AC):
Vehicle connector or socket type:
Supply-side plug or wiring configuration:
Rated voltage / frequency / phase / maximum current:
Cable length(s) and how each length should be measured:
Mandatory options, accessories, labels, and manual languages:
Required documents and when each is due:
Sample quantity / planned production quantity / quantity breaks:
Required shipment or delivery window:
Quote currency / requested Incoterms® rule and named point:
Warranty scope to price:
Return your quotation number and revision, exact order code,
itemized prices, lead-time trigger, and validity date.
List deviations, exclusions, and buyer-supplied items against each SKU.Normalize Electrical Ratings and Included Parts
Match these five fields before comparing unit prices
Compare each supplier’s order code against the same buyer specification. The code should let your team track that supplier’s exact configuration from quote to sample to order.
- Exact order code. Ask for the orderable variant and the matching rating-label image or drawing, with its revision where available. If the web name, quote code, and label differ, request a written mapping.
- Vehicle connection. State whether the unit has a tethered connector or a socket, which type is required, and whether any detachable cable is included.
- Supply connection. Record the exact mains plug for a portable unit or the specified supply connection for a wall-mounted unit. Have a qualified local installer confirm site requirements where applicable.
- Electrical rating. Compare voltage, frequency, phase, and maximum current in the written specification. Ask which supply and settings the quoted power rating assumes.
- Cable lengths. Specify which lead each length describes. For portable units, distinguish the supply lead from the vehicle lead. Compare the same measurement basis across offers.
The EA-02 page shows three A02-2 GB/T catalog codes. Use the table to identify a candidate code, then request the matching plug, cable lengths, and documentation in the quote. EA-02 configuration table
For a refresher on the two connections, see the portable charger vehicle and supply guide.
Compare the contents of the carton too. Ask for a packing list or contents drawing that identifies brackets, cable holders, access cards, manuals, labels, and retail packaging where required. Add buyer-supplied items to the comparison and request the price of required parts that are sold separately.
Separate Standard Features from Paid Options
Have each supplier mark every requested protection option, display, access card, app, controller, or cloud service as included, priced option, unconfirmed, or unavailable. Ask for the part or variant reference and price basis for each required option. For protection features, have the supplier identify the exact assembly and provide the applicable documentation for qualified review.
One-time activation or a recurring charge?
For connected units, request separate lines for activation, ongoing service, and replacements. Ask whether each fee applies per device, account, or site, what the first term covers, and what charging or access functions are available without activation or during a connectivity loss. If the service is required, ask what happens to the license when a unit is replaced under warranty.
For example, NRGkick sells a permanent Open Charge Point Protocol (OCPP) activation tied to a single NRGkick unit and describes it as non-transferable. That makes a replacement-unit activation a cost to clarify in writing. The Town of Watertown, Connecticut, also gave bidders separate lines to quote five years of prepaid networking and five years of parts and labor coverage in its 2025 Level 2 solicitation. NRGkick OCPP activation · Watertown bid, pricing form
If one supplier has quoted a required service and the other has left its fee blank, leave that comparison on hold. Ask for the fee or written confirmation that it is included for the requested term. Price optional features separately so you can also compare the base configuration.
Compare Documentation and Acceptance Evidence
Give each required document its own RFQ line. Ask for the data sheet, rating-label image, instructions, and any market-specific evidence applicable to the offered configuration. For an approval or certification claim, record the document ID, issuer, holder, listed model, and scope. Where the buyer needs whole-unit evidence, check that the record covers the complete charger. UL Solutions, for example, provides a database that can be used to look up UL certification records for products and components. UL Product iQ certification database
Record what the supplier can share with the quote, what must arrive before sample approval, and what is a condition of a purchase order. Ask how the proposed sample will be identified and which documents will accompany it. If the sample code differs from the production code, require a written explanation covering hardware, firmware, labeling, and accessories before approving it as representative.
Align Delivery Terms and Warranty Scope
Put the quotes on the same currency, quantity tier, packaging basis, and delivery terms. State the chosen Incoterms® rule, the precise named port, place, or point, and the edition. The named point serves different purposes depending on the rule, including delivery or the destination to which the seller arranges carriage. Ask for a revised offer on your requested basis if the supplier uses a different rule or point. ICC guidance on using Incoterms® 2020
Compare validity dates, payment milestones, and the trigger for the quoted lead time. A production estimate measured from artwork approval gives you a different schedule from an estimate measured from order placement. Give suppliers a target that distinguishes ready-to-ship and required arrival dates.
Ask when warranty coverage starts, what remedies apply, and who pays for parts, labor, and shipping in each direction. Record any terms for units that arrive defective. Keep the result as the comparison of supplier offers. For the later landed-cost calculation, collect separate estimates for the freight, clearance, duties, or other import costs that fall to you under the agreed terms.
What if suppliers quote different minimum order quantities?
Ask both to reprice at a quantity you can commit to. If one supplier can only quote at a higher minimum, keep it as a separate order scenario and write down the total commitment. The lower unit price may require more inventory than you intend to buy.
Use a Clarification Log Before Shortlisting
Copy the worksheet below for each buyer SKU. In each response cell, record the status and the quote line or document that supports it. Log a price difference once both offers cover the same requirement. For items that need follow-up, record the question, who will answer it, and the deadline. A missing price remains open until the supplier confirms it.
| Line / buyer requirement | Supplier A response | Supplier B response | Cost impact or open question / owner / due date |
|---|---|---|---|
| Quote number, revision, and exact order code | |||
| Rating label and electrical configuration | |||
| Cable lengths, accessories, and packaging | |||
| Required protection feature and evidence | |||
| Access or software, activation, and recurring term | |||
| Exact-model documents and sample evidence | |||
| Unit price at the agreed quantity and currency | |||
| Delivery rule, named point, lead-time trigger, and validity | |||
| Included warranty scope and shipping responsibility |
Illustrative price comparison. Two quotes cover 100 units in USD under the same delivery terms. Both must include a wall bracket and the first year of device access for each unit. A quotes $160 per unit with both included. B quotes $149 for the charger, $8 for the bracket and $4 for the first year of access. The comparable prices are $160 and $161 per unit, or $16,000 and $16,100 for the stated order. If B supplies only the base and bracket prices, its comparable total remains unknown. Ask B for the written line item before ranking either offer. Break out renewals and later landed costs separately.
Give each offer a decision. Comparable means all mandatory requirements are confirmed and priced on the common basis. Hold means a required price, document, or variant detail remains unresolved. Alternate flags a separate configuration for review. Decline applies when the supplier confirms it cannot meet a mandatory requirement. Carry the accepted configuration, included items, and commitments from the selected quote into the purchase specification.
Send iEVtime your destination market, required configuration, sample and first-order quantities, named delivery point, and must-have options. Ask for an itemized offer and exact-model documentation through wholesale EV charger ordering.


